Automatic Vertical Packing Machine for Milk Powder Food Application Plastic Pouch and Bag Packaging with Labeling Function

Product Description

Packaging Equipment 1
Packaging Equipment 2
Packaging Equipment 3
Model HMD-420 HMD-520 HMD-620 HMD-730
Packing Speed 70 bag/min 65 bag/min 50 bag/min 45 bag/min
Bag width 60-200 mm 80-250 mm 100-300 mm 140-350 mm
Type of bagmaking Pillow bag, gusseted bag, punched hanging bag
Max film width 420 mm 520 mm 620 mm 730 mm
Film thickness 0.04mm-0.12mm
Air consumption 0.8Mps 0.5m³/min
Supply voltage 3KW 220V 50Hz/60Hz 3KW 220V 50Hz/60Hz 3.5KW 220V 50Hz/60Hz 3.5KW 220V 50Hz/60Hz
Machine size 4160*1050*1410mm 1480*1130*1450mm 1600*1300*1790mm 1350*1780*2050mm
Packaging Process Detail 1
Packaging Process Detail 2
Packaging Process Detail 3
Machinery Component 1
Machinery Component 2
Machinery Component 3
Finished Package Output 1
Finished Package Output 2
Finished Package Output 3
FAQ
Q: Are you trading company or manufacturer?
A: Yes, We are factory, all machine is made by ourself and we can provide customize service according to your requirement.
Q: How long is your delivery time?
A: Generally it is 1-3 days if the goods are in stock. or it is 3-7 days if the goods are not in stock, it is according to quantity.
Q: What about your warranty?
A: Our warranty is 1 year, all machine part can be replaced for free within 1year if broken(not including man made).
Q: Is there any installation direction after we received the machine?
A: Yes, we have a professional technical team and warm after service. We will solve any problem you meet during the installation and packing production in time.
Q: Is there any ensurance to guarantee my order?
A: We are an onsite check factory, and the quality, delivery time, your payment are all ensured by trade assurance.
Q: What is Our Advantages?
  • Provide customized services for special requirement;
  • Competitive price and reliable quality;
  • Professional inspection department to guarantee quality;
  • We ready for immediate delivery, OEM order delivery during 3-5 working days;
  • Conveniently situated with easy access to major shipping ports and airports for efficient logistics.

Related Products